I figure since it is almost the middle of May that it is high time to share my finished projects from April. It was a good month, even though I didn't spend a ton of time sewing. With beautiful weather and an early spring, I spent more time than usual outside and less evenings at the sewing machine. I still got in 12 hours and accomplished the following:
- Finished my Sunflowers quilt, my first quarter challenge quilt.
- Went to the International Quilt Festival in Cincinnati with Jill, and had the fun of seeing her quilt on display!
- Selected fabrics, cut, and fused 2 snowman blocks.
- Cut backings and borders for two charity quilts, quilted both and machine bound one.
- Cut a kit to make a quilt as a present.
- Loaded and quilted the snowman quilt for my mom, who gave it to my SIL
- Finished detail stitching, assembly, and sewed on buttons for my firecracker pillow
The big plans for May have already been revealed, so I don't have a lot of lofty goals for sewing. I mainly want to make sure I can be out of the upstairs room and start getting myself organized downstairs so I can sew when I want to.
Hope you had a great April and are enjoying May so far.
- Finished my Sunflowers quilt, my first quarter challenge quilt.
- Went to the International Quilt Festival in Cincinnati with Jill, and had the fun of seeing her quilt on display!
- Selected fabrics, cut, and fused 2 snowman blocks.
- Cut backings and borders for two charity quilts, quilted both and machine bound one.
- Cut a kit to make a quilt as a present.
- Loaded and quilted the snowman quilt for my mom, who gave it to my SIL
- Finished detail stitching, assembly, and sewed on buttons for my firecracker pillow
The big plans for May have already been revealed, so I don't have a lot of lofty goals for sewing. I mainly want to make sure I can be out of the upstairs room and start getting myself organized downstairs so I can sew when I want to.
Hope you had a great April and are enjoying May so far.
Comments